Holding the window.
Building the platform.
ARGUS turns live rig data into managed pressure control on the rig floor. The full platform is in commissioning — the site goes live soon.
ARGUS turns live rig data into managed pressure control on the rig floor. The full platform is in commissioning — the site goes live soon.
ARGUS targets non-productive time. Enter your own fleet and spread rate to see what recovering that time is worth — nothing is sent anywhere, it all runs in your browser.
Modelled estimate, not a performance guarantee. Fuel burn is taken at 2,000 gal/day onshore and 8,450 gal/day offshore, with combustion at 10.18 kg CO₂ per gallon; the car equivalence uses 4.6 t CO₂ per vehicle-year. Every input above is yours to change.
While the platform is in commissioning, the thinking behind it is already public. Under Pressure is where our co-founder Santiago Callerio writes up managed pressure drilling in the open — field practice, well control, and the Python behind the analysis.
New BSEE rules for managed pressure drilling, mud gas separator design, kick tolerance modelling, and where offshore leasing is heading.
Treating MPD as a full-lifecycle philosophy rather than a point solution — extending lateral reach, halving tripping time, and taking cementing off the critical path.