Commissioning

Holding the window.
Building the platform.

ARGUS turns live rig data into managed pressure control on the rig floor. The full platform is in commissioning — the site goes live soon.

Bottomhole Pressure · Drilling Window ● Live
BHP
5,240psi
Window
±85psi
Status
IN WINDOW
Launching soon Get in touch
Run your numbers
Value Estimator

Run your numbers

ARGUS targets non-productive time. Enter your own fleet and spread rate to see what recovering that time is worth — nothing is sent anywhere, it all runs in your browser.

Rig-days
recovered / yr
Cost avoided
/ yr
Diesel saved
/ yr
gal
CO₂ avoided
/ yr
t
Equivalent to taking cars off the road for a year

Modelled estimate, not a performance guarantee. Fuel burn is taken at 2,000 gal/day onshore and 8,450 gal/day offshore, with combustion at 10.18 kg CO₂ per gallon; the car equivalence uses 4.6 t CO₂ per vehicle-year. Every input above is yours to change.

Field Notes

Under Pressure

While the platform is in commissioning, the thinking behind it is already public. Under Pressure is where our co-founder Santiago Callerio writes up managed pressure drilling in the open — field practice, well control, and the Python behind the analysis.

  1. The Evolving Frontier of Well Control: 2025 IADC Well Control Conference Review

    New BSEE rules for managed pressure drilling, mud gas separator design, kick tolerance modelling, and where offshore leasing is heading.

  2. Beyond the Bit: How Holistic MPD is Redefining the Well Construction Playbook in Vaca Muerta

    Treating MPD as a full-lifecycle philosophy rather than a point solution — extending lateral reach, halving tripping time, and taking cementing off the critical path.

Read the blog RSS